An HVAC replacement in Round Rock needs a clear handoff between equipment selection and installation access. Compare the full system totals, then review how the indoor and outdoor equipment will be reached.
Mayer Conditioning · Texas HVAC license TACLB27207E · Service availability confirmed for your property.
Match the system to the actual work.
A quoted system must match more than the outdoor unit. Indoor access, furnace orientation, thermostat needs, and the route for removing old equipment can change the installation scope even when the listed capacity is the same.
Confirm the existing heat source: straight cooling with electric heat, a heat pump, or a gas furnace and AC. A change of fuel or system type needs its own scope review.
Have Mayer review the heating and cooling load, duct condition, electrical supply, gas and venting where applicable, equipment orientation, and the matched indoor and outdoor models. Three tons is a comparison size, not a sizing recommendation.
Review access, refrigerant and condensate connections, thermostat compatibility, required permits, and any duct or electrical work outside the listed standard installation before approving the total.
FULL PRICES FOR THE LISTED STANDARD SCOPE
Three system types, one comparison size.
These three-ton residential examples compare system types. They are not a sizing recommendation; Mayer confirms load, exact model match, and installation scope. Prices come from the central catalog. No separate customer sales tax.
On a narrow screen, scroll the comparison horizontally. The product details below also show each full price.
Selected catalog installations · USD · optional items not selected
Monthly budgets equal the listed installation total divided by the catalog term and rounded to cents. They exclude interest and fees and are comparison estimates for qualifying customers, not lender offers, APR calculations, payment quotes, or approvals. The financing provider determines actual terms, fees, payments, repayment period, and eligibility. Financing options and the 50% deposit route are reviewed in the central store. The remaining balance is due at installation completion; approved additions change the total.
Review the exact models, included work, exclusions, and written warranty conditions. Site findings or selected options belong in the final approved proposal.
A complete single-stage straight cooling package with the matched indoor and outdoor equipment listed below, professional installation and standard installation materials. Compare the supplier-listed SEER2 rating and exact model combination; Mayer confirms sizing, current regional eligibility, compatibility and availability before installation. Photo is representative; exact equipment models are listed.
outdoor
GLXS4BA3610
indoor
AMST36CU1300
heater
HKTSD10X1
AHRI
214859638
Included installation work
Matched HVAC equipment, installation labor, and standard materials.
Startup, system operation, and safety check.
Modifications up to 36 inches where listed and applicable: refrigerant piping, gas piping, venting, condensate, and high/low voltage connections.
Supply/return duct modifications up to 24 inches where listed.
Overflow safety switches; filter box and filter when required by the installation.
LP conversion kit when required for the selected furnace.
Additional refrigerant needed for proper operation when required.
Inspection of existing outdoor disconnect and whip; existing items are reused in most cases.
One year of Mayer Conditioning labor warranty.
Excluded work & optional items
Thermostat, unless selected as an add-on or provided by the homeowner.
Drain pan replacement or treatment.
Duct sizing, sealing, repairs, or register/grille replacement.
Replacement of existing filters.
Permit fees are excluded where applicable. Required permits and code compliance are confirmed before work.
Outdoor condenser pad replacement, disconnect replacement, or main-panel breaker work.
Bringing existing code conditions or pre-existing equipment, ductwork, electrical, plumbing, or structural issues into compliance.
Warranty & written conditions
Manufacturer coverage listed for this series: 10 Year Limited Parts Warranty. Model-specific written terms, registration and eligibility requirements apply.
One year of Mayer Conditioning labor coverage is included. The selected optional Mayer labor plan replaces the included labor term. Manufacturer parts coverage and Mayer labor coverage are separate.
Tell us if you’re dissatisfied. We’ll have a reasonable opportunity to inspect and correct the concern. If it remains unresolved, the written promise provides for removal of Mayer-installed equipment or parts and a refund of amounts paid directly to Mayer for them.
The written terms explain that original equipment may not be available for reinstallation after removal.
If the same major component has more than three verified manufacturer-related mechanical failures within 24 months of original installation, Mayer replaces that specific component at no additional charge, subject to the written terms.
Coverage applies to the qualifying component, not automatically to the entire HVAC system. Written exclusions and customer responsibilities apply.
A complete single-stage heat pumps package with the matched indoor and outdoor equipment listed below, professional installation and standard installation materials. Compare the supplier-listed SEER2 rating and exact model combination; Mayer confirms sizing, current regional eligibility, compatibility and availability before installation. Photo is representative; exact equipment models are listed.
outdoor
GLZS4BA3610
indoor
AMST36CU1300
heater
HKTSD10X1
AHRI
215213859
Included installation work
Matched HVAC equipment, installation labor, and standard materials.
Startup, system operation, and safety check.
Modifications up to 36 inches where listed and applicable: refrigerant piping, gas piping, venting, condensate, and high/low voltage connections.
Supply/return duct modifications up to 24 inches where listed.
Overflow safety switches; filter box and filter when required by the installation.
LP conversion kit when required for the selected furnace.
Additional refrigerant needed for proper operation when required.
Inspection of existing outdoor disconnect and whip; existing items are reused in most cases.
One year of Mayer Conditioning labor warranty.
Excluded work & optional items
Thermostat, unless selected as an add-on or provided by the homeowner.
Drain pan replacement or treatment.
Duct sizing, sealing, repairs, or register/grille replacement.
Replacement of existing filters.
Permit fees are excluded where applicable. Required permits and code compliance are confirmed before work.
Outdoor condenser pad replacement, disconnect replacement, or main-panel breaker work.
Bringing existing code conditions or pre-existing equipment, ductwork, electrical, plumbing, or structural issues into compliance.
Warranty & written conditions
Manufacturer coverage listed for this series: 10 Year Limited Parts Warranty. Model-specific written terms, registration and eligibility requirements apply.
One year of Mayer Conditioning labor coverage is included. The selected optional Mayer labor plan replaces the included labor term. Manufacturer parts coverage and Mayer labor coverage are separate.
Tell us if you’re dissatisfied. We’ll have a reasonable opportunity to inspect and correct the concern. If it remains unresolved, the written promise provides for removal of Mayer-installed equipment or parts and a refund of amounts paid directly to Mayer for them.
The written terms explain that original equipment may not be available for reinstallation after removal.
If the same major component has more than three verified manufacturer-related mechanical failures within 24 months of original installation, Mayer replaces that specific component at no additional charge, subject to the written terms.
Coverage applies to the qualifying component, not automatically to the entire HVAC system. Written exclusions and customer responsibilities apply.
A complete single-stage gas furnace & ac package with the matched indoor and outdoor equipment listed below, professional installation and standard installation materials. This is the vertical configuration. Compare the supplier-listed SEER2 rating and exact model combination; Mayer confirms sizing, current regional eligibility, compatibility and availability before installation. Photo is representative; exact equipment models are listed.
outdoor
GLXS4BA3610
furnace
GR9S800603BN
coil
CAPTA3626B3
AHRI
214859843
Included installation work
Matched HVAC equipment, installation labor, and standard materials.
Startup, system operation, and safety check.
Modifications up to 36 inches where listed and applicable: refrigerant piping, gas piping, venting, condensate, and high/low voltage connections.
Supply/return duct modifications up to 24 inches where listed.
Overflow safety switches; filter box and filter when required by the installation.
LP conversion kit when required for the selected furnace.
Additional refrigerant needed for proper operation when required.
Inspection of existing outdoor disconnect and whip; existing items are reused in most cases.
One year of Mayer Conditioning labor warranty.
Excluded work & optional items
Thermostat, unless selected as an add-on or provided by the homeowner.
Drain pan replacement or treatment.
Duct sizing, sealing, repairs, or register/grille replacement.
Replacement of existing filters.
Permit fees are excluded where applicable. Required permits and code compliance are confirmed before work.
Outdoor condenser pad replacement, disconnect replacement, or main-panel breaker work.
Bringing existing code conditions or pre-existing equipment, ductwork, electrical, plumbing, or structural issues into compliance.
Warranty & written conditions
Manufacturer coverage listed for this series: 10 Year Limited Parts Warranty. Model-specific written terms, registration and eligibility requirements apply.
One year of Mayer Conditioning labor coverage is included. The selected optional Mayer labor plan replaces the included labor term. Manufacturer parts coverage and Mayer labor coverage are separate.
Tell us if you’re dissatisfied. We’ll have a reasonable opportunity to inspect and correct the concern. If it remains unresolved, the written promise provides for removal of Mayer-installed equipment or parts and a refund of amounts paid directly to Mayer for them.
The written terms explain that original equipment may not be available for reinstallation after removal.
If the same major component has more than three verified manufacturer-related mechanical failures within 24 months of original installation, Mayer replaces that specific component at no additional charge, subject to the written terms.
Coverage applies to the qualifying component, not automatically to the entire HVAC system. Written exclusions and customer responsibilities apply.
What do these hvac replacement examples cost in Round Rock?
The selected catalog examples range from $5,154.43 to $6,113.96 for their listed standard residential installation scopes. This is a range for the selected examples, not a quote for every property or the entire catalog. No separate customer sales tax is added. Mayer confirms fit, scope, and any approved extra work before the final proposal.
What should I prepare for the equipment review?
Photograph the indoor equipment location from normal safe access. Describe stairs, gates, or other restrictions along the equipment route. Confirm who can approve changes if the access review identifies extra work. Photos and model labels are helpful when they are accessible without opening equipment or entering an unsafe area.
How is the 50% deposit calculated?
The deposit is half the approved total in cents, rounded to the nearest cent. The completion balance is the total minus that deposit, so the two amounts always add up exactly. The comparison shows the split for each base catalog price; options or approved site work change the final total.
What warranty information should I compare?
Read the selected product’s catalog warranty and written conditions. The examples include one year of Mayer Conditioning labor coverage; manufacturer parts coverage follows model-specific terms and registration requirements. Optional five-year ($495) and ten-year ($995) labor plans are additional choices, excluded from the displayed base prices.
When can I discuss and schedule the replacement?
Scheduling: 7 a.m.–7 p.m. Central, seven days a week. Usually contacted within 15–30 minutes; after-hours requests by 10 a.m. the next morning. Text a Tech: 7 a.m.–midnight, seven days a week. Installations Monday–Friday; Saturday available with an agreed overtime fee. All times Central. These are contact and installation planning windows, not a promise of an immediate appointment. The actual equipment and installation date are confirmed with Mayer.
Related work at the property.
These pages explain repairs, evaluations, and commercial scopes that may need a separate review.
Other communities we serve.
Review service information for another property, or view the full service area. Availability is confirmed for the trade, property, and schedule.
TELL US ABOUT THE PROPERTY
Plan the next step in Round Rock.
Share your property location, contact name, mobile number, email, and a short description of the work. Existing model labels, prior findings, and accessible photos help Mayer review the request. Gather information only from normal, safe access.
Scheduling: 7 a.m.–7 p.m. Central, seven days a week. Usually contacted within 15–30 minutes; after-hours requests by 10 a.m. the next morning. Text a Tech: 7 a.m.–midnight, seven days a week. Installations Monday–Friday; Saturday available with an agreed overtime fee. All times Central.
Coverage describes the service area. This page does not represent a separate office. Confirm the actual scope and installation date with Mayer.